Dedicated servers
One machine, one customer, specification published
One row per machine. Every column is the real figure: cores, memory, storage, uplink and the address block it comes with.
two
Machines in the range
same working day
Provisioning, in stock
10 Gbit as standard, 25 Gbit on request
Uplink on the entry machine
none
Setup fee
In stock and racked today · two machines available · same working day for anything in stock · no setup fee
The range
Eight machines. The table scrolls sideways on a narrow screen rather than being squeezed into one, because a specification that has been truncated to fit is not a specification.
| Machine | Processor | Cores | Memory | Storage | Uplink | Transfer | Per month |
|---|---|---|---|---|---|---|---|
| S1 | Desktop class | 6 c / 12 t | 64 GB DDR4 | 2 x 512 GB NVMe | 1 Gbit | 20 TB | 39.00 |
| S2 | Desktop class | 8 c / 16 t | 64 GB DDR5 | 2 x 1 TB NVMe | 1 Gbit | 20 TB | 58.00 |
| S3 | Desktop class, high frequency | 16 c / 32 t | 128 GB DDR5 | 2 x 1.9 TB NVMe | 1 Gbit | 20 TB | 109.00 |
| M1 | Server class, single socket | 24 c / 48 t | 256 GB DDR5 ECC | 2 x 3.8 TB NVMe | 10 Gbit | 50 TB | 218.00 |
| M2 | Server class, single socket | 24 c / 48 t | 256 GB DDR5 ECC | 4 x 3.8 TB NVMe | 10 Gbit | 50 TB | 284.00 |
| M3 | Server class, single socket | 32 c / 64 t | 384 GB DDR5 ECC | 4 x 7.6 TB NVMe | 10 Gbit | 50 TB | 396.00 |
| L1 | Server class, dual socket | 96 c / 192 t | 768 GB DDR5 ECC | 8 x 7.6 TB NVMe | 25 Gbit | 100 TB | 874.00 |
| L2 | Server class, dual socket | 192 c / 384 t | 1.5 TB DDR5 ECC | 12 x 7.6 TB NVMe | 25 Gbit | 100 TB | 1,640.00 |
One machine, in full
What a row in that table actually means, taking M2 as the example.
M2
A two-socket-class single-socket machine with four NVMe devices and a ten-gigabit uplink. Built for a database you do not want to share, or for a hypervisor host you intend to fill.
- Processor
Server class, single socket, 24 cores, 48 threads - Memory
256 GB DDR5 ECC registered, 8 channels populated - Storage
4 x 3.84 TB NVMe, no hardware controller in the path - Network
10 Gbit, unmetered port, 50 TB included transfer - Addressing
IPv4 /28 and IPv6 /48, both routed to the machine - Management
Out-of-band console and power control, included - Term
Monthly, no minimum, cancel at the end of a period
From
284.00
per month, excluding any tax that applies
In stock. Racked and handed over the same working day.
What the extras cost
Published, so you do not have to ask. Everything on this card is optional and nothing is added to an order you did not place.
| Item | Unit | Rate |
|---|---|---|
| Additional uplink, 10 Gbit | per month | 45.00 |
| Additional uplink, 25 Gbit | per month | 120.00 |
| Transfer beyond the included allowance | per TB | 1.20 |
| Additional IPv4, /29 | per month | 8.00 |
| Additional IPv4, /28 | per month | 15.00 |
| IPv6, /48 | per month | 0.00 |
| Remote hands | per 15 minutes | 20.00 |
| Off-site backup | per TB per month | 4.00 |
| Private VLAN between machines | per month | 0.00 |
Where the machines are
| Facility | Machines | Colocation | Private cloud | Uplink | Round trip |
|---|---|---|---|---|---|
| Facility A | Dedicated, VPS | Yes | Yes | 10 / 25 Gbit | Under 2 ms |
| Facility B | Dedicated, VPS | Yes | Yes | 10 Gbit | Under 8 ms |
| Facility C | Dedicated | No | Yes | 10 Gbit | Under 20 ms |
Questions we are asked
Is this a real machine or a slice of one?
A real machine. One customer, one box, and the row in the table is the box you get rather than a tier you are placed in.
Can I specify something that is not in the table?
Yes. You are told the parts, the lead time and the price before anything is ordered, and the lead time is the one we expect rather than the one that sounds best.
What is the out-of-band console for?
Reaching the machine when the operating system will not boot, and power-cycling it without asking anybody. It is included rather than sold as an extra.
What happens when I go over the transfer allowance?
You are billed at the rate on the card above, per terabyte, and told before it happens rather than in the invoice.
Do you oversubscribe the uplink?
The port is unmetered and the transit is bought against measured peaks rather than against the sum of the ports. The capacity figure on the network section is the one that matters.
How do I cancel?
In the console, in one place, with no telephone call. It takes effect at the end of the period you have paid for.
Next step
Order a machine, or ask what fits
If you know the specification, take it from the table. If you do not, describe what has to run on it.